From mid September until mid November, the man cave was out of commission so I set up a temporary system in our living room.
Flooding in the lower level had been a major issue since we moved to this house. Tish and I finally bit the bullet and had a French drain + sump pump system installed.
Knowing that jackhammers would create a big mess, we packed up all of our books, LPs, CDs, etc.
I had to repaint/reseal the floor because it was badly scratched by contractor traffic.
Listening lounge chair
At least 12 square feet of floor space was gained from the removal of a built-in bench. We reclaimed a small window that had been blocked off, which most likely had an a/c in the past.
Monaural hifi view
Stereo + Monaural Hi-Fi |
Still working on the main hifi system and filing my LPs...😉
I'm really liking the less cluttered look, which means I have to reduce my audio collection. So keep your eyes peeled for goodies at the JE Labs Flea Market after the New Year. 😄
No comments:
Post a Comment